Tuesday, October 30, 2018

Signature Park - Final Photos

Hello Hello!
3 bedder condominium
New parents staying with a one year old baby and grandparents. Vinyl flooring for the living, dining and bedrooms. All walls were given a fresh coat of paint, full electrical works, full works to the bathrooms and kitchen.
 above: Living with new vinyl floor, paint, aircon and false ceiling


 above: tv console details
 above: top cabinets (white) above tv console for added storage. We are hoping that with a white laminate it will "merge" into the beams and not look so "out" of place.
above: behind the dining table, a row of half height cabinetry for storage and double up as a pantry area within reach from dining.


 above: marble slab dining table top


 above: doorway to common bathroom



 above: double sinks with top and bottom cabinet to Master bath. There so much storage space that the new homeowners are overwhelmed! I suppose it's a good thing right?


 above: double sink vanity with pattern tile backsplash.

 above: wardrobe handle detail.
 above: kitchen island with quartz countertop.
 above: top and bottom kitchen cabinet with glass backsplash

 above: 2 tone kitchen. Dove grey and light wood.
above: matching footstool and kitchen tiles, same shade to the 2 tone kitchen.

CLICK for pre-reno photos.

hope everyone enjoyed the little house tour and many thanks to our couple who graciously allowed us to take these pretty photos!

Sunday, October 28, 2018

Reno@432B - Watching the dry partition guy doing his work



so messy right?
Anyway we were there for 5 mins, looked around and left the 2 guys to their work.

LinkWithin

Related Posts Plugin for WordPress, Blogger...