Thursday, April 29, 2021

Reno@Mt Faber | Progress Updates

 


Super sleek, stained over existing parquet.

OMG, really love this bright and airy master bathroom! Lots of daylight streaming in here.





Tuesday, April 27, 2021

Reno@Segar II | Master Bedroom Wardrobe and headboard

A master bedroom where we did full carpentry to the wardrobe (6 doors), bed headboard and floating side cabinets on both side of the bed. The bed headboard comes with night lighting.

details of the bed headboard






A yellow armchair adds a "pop" of colour to the bedroom, coupled with a side table makes a cozy corner. I hear this corner has now become the favourite space in the evenings for the missus to do her face mask, relax and watch telly!







Sunday, April 25, 2021

Reno@Segar II | Sneak Peeks

hello!

it's been awhile. Here's some sneak peek photos of a recently completed home reno under $30k! Here's what we did for under $30k. Carpentry to 2 toilets (master and common), bathroom toilet doors, full painting works to the entire flat, wardrobe to master and 2 bedrooms and minor electrical works.










master bathroom - mirror, re-laminated the tall open shelf and bottom vanity. 
New quartz countertops for both bathrooms


 stay tuned for more photos updates within the week!

Saturday, April 24, 2021

Reno@Northshore | Aircon trunking

 

Running aircon pipes can be such a headache right? And it looks so box-y and ugly...













LinkWithin

Related Posts Plugin for WordPress, Blogger...