Sunday, April 13, 2014

Reno@Toh Yi Maisonette - electrical wirings next!

Now our weekend routines is to try to leave our kids with our parents in the morning, whichever side is free to look after the 2 rascals straight after our breakfast cum lunch.
Once we settle the kids, we will rush to all our reno sites and have site meetings there together with contractors, electricians and clients. 

Afternoons, we will meet up with our current clients whose reno are undergoing design implementation and sometimes do some site visits which we couldn't make it in the morning slots.

And time flies so fast! weekend is gone already.

enough said. Here are some photo updates on our Toh Yi Maisonette reno. 
Enjoy!


 Flooring all completed and protected.
 Wall tiles in all the bathrooms completed. Leaving the shower niche to be tiled next.

 Electrician will be coming in this week to fix up all the loose wirings. Think he will take at least 1.5 weeks to pull all the cables for the switches, powerpoints and lights.

 While the adults are having a meeting in the flat, the kids are having their play outside!
There's Jules peering through a slit hole in the parapet wall of the common corridor. He's the tiniest of the lot as the couple's children are very very tall. Just like the couple.

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...