Tuesday, July 08, 2014

Reno@Geylang - Carpentry is 90% completed!!!

The Bachelor Pad
it's almost near completion!!! YAY! The carpentry was up within 3 days and the silestone countertop is slated to come end of this week, afterwhich the glass backsplash will be up. The painters have dismantled the existing timber doors to bring back to the factory for a spray paint job. Meanwhile, they are painting the door frames and piping works.

here's quick look at the overall progress.

Nice looking wood grains here for the kitchen, running vertically. Usually we have the top cabinets in white and bottom wood, but for this home, we reversed the colour palette.

 kitchen larder for condiments, knives and ladles and what nots. Placed near the stove for easy retrieval.

 Lots of deep drawers here for storage.
black ceiling fan.
 view of dining area
 

 looking towards the store room
 bedroom 3 with cove lights and ceiling fan. 
Flooring completed too.
White with black accents. 
Our kind of colour palette.
 HIS wardrobe.



common bath. 
Black framed bifold doors
Black painted pipes



stay tune for the Final Photos!

xoxo
velle

Monday, July 07, 2014

Reno@Sembawang - Carpentry works

Carpentry works have been going for a week now and it's almost near completion. Let's start from the living and entrance foyer where we have the customised tv console and shoe cabinet. The shoe cabinet is specially designed to have the same depth as the existing DB cupboard, therefore, it's much shallower than most shoe cupboards. Doesn't look like the usual DB box now right?

That's because we took out the existing doors and replaced it with new ones so that it looks like one of our cabinets.

For the kitchen, the couple specially requested for side drawers around the kitchen sink. Below are some photos to illustrate what I'm talking about.

And above the kitchen counter, we have 2 long shelves with integrated lights to shine onto the countertop. Really pretty! And the sides of the tallboy was specially chosen by the missus to match the countertop which will be installed later this week. so stay tune for the final looks!

xoxo
velle

above: side drawers under the kitchen sink

 






 above: open shelf above kitchen counter. 
Laminate specially chosen by the missus to match the kitchen counter top
more carpentry works...

master bath - vanity with full length mirror on top. 
Makes the whole bathroom looks bigger. It's not finished yet, have to wait for the countertop to come in and install the faucets and WC, then the whole bathroom will be complete.

Saturday, July 05, 2014

Reno@Geylang - Carpentry is coming up this week and painting works is almost 90% completed

The bathrooms wet trades are complete now. Leaving the carpentry works. This week, the painter will come and paint all the pipes black.



here's the RC stiffener which we plastered it into a rectangle. Originally, it was a kinky L shape thing. Photo of the pretty DB box in white.

Taduh! I give you the living room!!! Bright and new.
click here for pre-reno photos.

Reno@Bt Timah - Tiling works

 Brick wall in the living room up! Lots of terracota roof tiles on site (left of photo)
 Helper's room walls are erected.
 staircase railing is up!
 Photo progress of the bathrooms upstairs.
 
List of works to be completed - so many and so little time!
  • tiling works - 50% 
  • aircon trunking - 90%
  • electrical - 50%
  • plumbing - 50%
  • new roof
  • new windows - 80%
  • false ceiling and partition works 
  • parquet
  • painting
  • carpentry
  • glass
  • countertops

Reno@CCK Maisonette - Basic HDB floorplan

 
 

Home@Stirling - New BedSheets!


Bought this new bedsheets from IKEA during a sale and loving it lots!