Reno@B3 Maisonette - box up in progress
Rem the last time we were here to discuss with our contractor on how to box up the air con trunking. The lower floor was relatively easy but when it came to the upper floor, that was the headache part where some of the trunking were going under the existing beams and puncturing through the door frames.
today, the box up is well under way...but there's still much more work to be done here. Today we managed to secure a timeslot with the head carpenter to go through the site measurements for the carpentry.
today, the box up is well under way...but there's still much more work to be done here. Today we managed to secure a timeslot with the head carpenter to go through the site measurements for the carpentry.
Monday, October 23, 2017
Reno@B3 Maisonette - tiling....
Full reno to toilets takes up almost 1 month of time to complete.
that's because there's so many trades involved in getting the job done.
From plumbing, electrical, waterproofing, tiling, windows, glazing, painting and down to carpentry.
Friday, October 20, 2017
Reno@B3 Maisonette - aircon trunking
here yesterday and We are here again! Today we are going through the box up for the aircon trunking with the main contractor.
Thursday, October 19, 2017
Wednesday, October 18, 2017
Reno@608BP - Kitchen updates
Subway tile backsplash done. Upper and lower cabinets installed. Electrical appliances installed. Now waiting for kitchen counter to be installed so that we can do plumbing next.
Labels:
608BP,
HDB,
kitchen,
renovation,
resale
Reno@608BP - Wardrobe updates!
wardrobe with open shelves and study table
zoom in on the open shelves detail
study table with view out
Labels:
608BP,
HDB,
renovation,
resale,
wardrobe
Happy Deepavali!
Went to visit one of our renovation sites and got caught up in the discussion that we forgot to take any photos.
Again.
Monday, October 16, 2017
Reno@32GME - Installing Lights
kitchen countertop is up last week.
We are here to go through the lights installation with the electrician.
See! The kitchen pendant lights are up. and so is the kitchen ceiling light too.
above: kitchen ceiling light
kitchen backsplash lights together with side switches all neatly aligned in a row on the right.