Tuesday, October 03, 2017

Reno@B3 Maisonette - Touching up the walls



 above: current staircase in parquet finish

above: plastering all the walls where the openings used to be so that they will be flat, straight and pretty. All the existing electrical wirings we have stripped them all down. We are going to do a complete electrical overhaul. This is usually best for major overhauls as it's not usually recommended to extend wires or just change electrical faceplates. Might as well do the whole works and sometimes we can even "flush" the electrical sockets into the carpentry.



wood tiles in the balcony. completed too.

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...