Saturday, August 21, 2010

Stirling HDB Terrace - #219 Built-in furniture Day 2

here are the kitchen updates on our 2nd day of cabinet werkz


Shifu(Master) is here to measure our sink....and here's a picture of his WuLinMiJi (secret manual)...hahahha...sure looks complicated with loads of numbers and scribbles.

While the guys are out for a lunch break, I managed to take some photos of our kitchen updates! ENJOY!!!!

(left)top cabinets and (right)bottom cabinets with pull out drawings

(left) a back wooden panel before the backsplash comes in at a later date, power sockets and switches cut out are also done! (right) our built in sink location at our breakfast counter.

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...