Saturday, December 03, 2011

Maisonette Serangoon - #7 Aircon ducting In

2 more days and here are the updates!


the rack for a system 3 hung up to receive the compressor.

walls are being plastered in the kitchen

Here's looking out from the kitchen

Sis room fully plastered wall and kitchen wall plastered too!

Here's looking from the yard and you can see the kitchen wall is done now...waterproofing laid to the kitchen floor before the floor tiles goes on top...this should take another 24hours or so.

staircase store room...all plastered!

here's looking at the pile of sand in the living room

Upstairs: Master > A/C shifted to top of toilet door.

Upstairs: Guestroom 2> A/C shifted to above door

Upstairs: Guestroom 1> A/C shifted to above door

Downstairs: Here's looking into the kitchen area....

Upstairs common toilet > wall erected



Upstairs Master toilet > wall plastered and waterproofing laid before floor tiles to go on top!

Downstairs: an internal view in sis's room.