Here are more updates on our Maisonette reno works:
men laying the floor tiles in the living room
here's at the little store area underneath the staircase
1st storey toilet updates: Floor and wall tiles all up
1st storey Kitchen: Electric works installed
2nd storey master toilet: Wall and floor tiles laid
2nd storey guest toilet: Same thing here, wall and floor tiles laid.
We have chosen the same wall and floor tiles for the upper toilets.
Only the 1st storey toilet has a different wall tile as it's smaller and better to have a light colour wall tile to brighten the little toilet up.
concrete plinth laid to receive the kitchen cabinetry.
Mrs of the house said that her MIL does heavy washing in the kitchen, so it's better to lift the kitchen cabinetry.
shifted the utility box from the guest room to just beside the main entrance gate for convenience and easy maintenance.
All switches in!