Monday, December 16, 2013

Reno@T Maisonette - Pre Reno Photos

view from entrance
Things for me to note:
If budget permits, to do all works if not to split to PHASE 2 reno!
1) option to stain staircase railing and current parquet
2) remove cove lights, repaint the whole house, green wall has to be repainted.
kitchen
3) pattern tiles in cement screed flooring to go - PHASE 2
4) option to hack off wall partially to allow for a glass partition into dining area to bring in more light - PHASE 2
5) new kitchen cabinets because previous owner was into cottage victorian style - PHASE 2
other side of kitchen, looking towards balcony
6) To hack off wall to allow visibility to the living areas - PHASE 2
7) bar counter at the end of the kitchen - PHASE 2
8) floor tiles got to change - PHASE 2
balcony with awning
9) washer and dryer to be placed side by side with low counter top above
10) clothes hanging system above low counter top
 Above: common bathroom downstairs
11) option to redo common bath downstairs if budget permits - PHASE 2
bedroom
bedroom

 Above: Master toilet
12) redo both bathrooms upstairs
Master room
13) Master room to be future lounge room
14) keep windows but remove window grilles upstairs
15) all ceiling fans to be removed
16) laminate flooring to be overlaid for upper floor
17) shoe cabinet location needs to be reviewed
Master room