Sunday, December 08, 2013

Reno@Yishun - Carpentry starting!!!

Full length tv console wall plus storage
The delivery of all the carpentry works started on thursday and the workers have been working their butts off fri and sat. So they have finished about 90% of the kitchen, 50% of the living, the dining storage bench is not up yet because it's a small piece and we need the space to maneuver things around.
The toilet top vanity was wrong because the carpenter did not do cabinets behind the mirror, so had to bring back and redo.
The walk-in wardrobe in the master is completed! But we need to do some slight adjustments to the door because of the aircon unit. And the handles are not up yet.
 Above: Kitchen carpentry. So sorry for the dark photos because today is such a rainy day!!!
HERS wardrobe

HIS wardrobe complete with 2m long study table for two



Above: this is how it looks with the track lights turned on. Love the lighting effect here.

Above: last but not least, the tv wall in the master, about70% completed. 
Hubs is carrying Jules here now cos he fell asleep in the car.
Oh yup, the master is still missing the integrated headboard, still not up yet.

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...