The electrician was there when we went there in the morning. The electrical works was about 30% completed. Most of the loose wires for the lower floor has been pulled and he was working upstairs when we got there.
The railings were up over the week. So the tiles are progressively being laid.
Close up on the upper floor where the threads are being laid with wood tiles.