this week, the electrician came down to lay all the cables first so that it can be hidden under the floor tiles.
So once after the conduit has been laid, the sand and all the tiles have been delivered to site. And tiling works can commence.
Hanging conduits. These are going to be embedded in the walls.
No comments:
Post a Comment