Reno@TY Maisonette - demolition works completed (running a race with our S Maisonette)

Tiles delivered at the void deck area this morning while we visited the site. There were 3 workmen working the huge pile of sand up to the flat, making several trips up and down.
All hacking of walls, wall and floor tiles completed. All the basin, WC and sanitary wares have been removed and so are the built in carpentry.

 Main door protected
 Current flooring being protected too. Saving the existing marble flooring.