Reno@Kovan Maisonette - Coordination work

When we got there, there was a worker laying the screeding bed in preparation for the living room tiles to go next. To the left is the study area with a half height wall and glass partition on top.
 here's looking at the entrance of the study room and door to the store room. Walls are fully plastered. Waiting to cure and then we can paint and tile the rest of the areas.
 They have also smoothen the walls in the staircase void area.



 some markings on the wall on how to lay our tiles.
So this is how it's going to look like base on the drawing sketch above for the tiling setting out. We are going to "catch" from the dividing line between the balcony and living room because that's where the bi-fold door is going to be.
For the living area, we will start from the main entrance door and start the setting out.
the balcony tile and the kitchen/study room floor tiles near to my shoes.
Then we have another sketch on how to lay the U channel for the bi-fold doors and where the 2 tiles going to meet.
After which we went upstairs to finalise the curb height, more tiling works, U channel for the shower glass partition sizes and height, glass door swing opening direction for both toilet entrances as well as the shower partition before we called it a day.
Really hope all the tiling works can finish by this week!

xoxo
velle