The bathroom vanity cupboards are up over the weekend too. However the top cabinet is slightly too deep outwards. This was because previously we had allowed for some shelving space behind the mirror, deep enough for a hair dryer, but the home owner decided that they didn't need the extra storage area behind the mirror, so we did away with the adjustable shelvings behind but the depth was still kept. So now it's too protruding out. So we will have to ask the carpenter to take it down and make it shallower.
The other slight hiccup was previously the top cabinet was too tall because the carpenter did not do a site measure and followed our drawing per say. Thank goodness the master toilet one fit because there wasn't a box up for the pipe works.
The good thing is that everything can be rectified as there are some cases which i heard from other clients is that they will have to live with the mistake. On the other hand, sometimes they get so cooped up with every single detail and try to make everything perfect that they end up very unhappy. On looking back, once they start to live in the flat, they suddenly realised that it's actually a very small mistake and that they actually needn't make themselves so miserable at that time and muled over it for such a long time.
I'm hearing these from experiences from home renos and well as wedding preparations. I guess they are all pretty the same. All brides do want to have their wedding perfect but to err is to human. So....
Keep Calm And Carry On.
Back to the reno, the shower head and mixer are all installed for both the bathrooms, technically the home owner can shower here already!! Heard they are planning on moving in next week.