Monday, November 04, 2013

Reno@Yishun - Toilet updates

Feature wall in common bath
Some reno updates on the Yishun flat. All the floor tiles have been finished and covered up with protective covering so there's not much I can take photos of. So here are some photos of the toilet updates!
everywhere looks like this now, with the protective covering.

Above: The new HDB flats are accessible friendly, meaning they have a small slope down from the common corridor inwards to the bathrooms. So we overlay new tiles but kept the existing floor tiles. And because of this, the shower area we have to build a kerb up to hold the glass shower partition which is shown in the photo above.
There's also a big "hole" at the bottom of the shower alcove area because there's where the current floor trap is. So we left a hole there so that the home owners can access it if there's a chokage.
Here's a zoom in photo of the "hole", you can see the floor trap in this photo.
The wall tiles in both the common and master bathroom are completed, now waiting for the shower glass partition to be erected and to install the shower set.
Above: U channel in the shower area, all ready for glass installation. Water pipes are all concealed in the shower alcove area too!

Next will be to touch up the wall tiles and do up the false ceiling, install the shower set and sink.
Heard from contractor that his carpenter is on leave this week, so there's not much progress for a week. Sadness. Hopefully we can finish this project in december as planned!!!

No comments: