Hi there!
We have just came from the Yishun Flat and now going to view the Toa Payoh flat with the contractor.
Hacking permit was submitted over the week and come Monday, hacking works for the floor will start as we have gotten our HDB approval permit. Hacking of walls still pending.
|
view of kitchen |
|
pipe works in kitchen |
|
view of kitchen from window area |
|
common bathroom |
|
view of living from kitchen |
|
view of living from balcony area |
|
view of future dining area |
Currently the bedroom will be converted to a dining area next time. So goodbye orange walls and star lights!
|
Part of master which we will add back the wall to form bedroom 2 |
|
view of master with half height wall |
|
|
Where the beam, column and half height wall is will be a future wall to separate the master and bedroom 2. The previous owner had both their children sleep in one room and knocked down a wall between bedroom 2 and master to form a long wardrobe space and study corner. So we are going to put back the wall because we need one room for the girl and one room for the boy!
Here's a relook at the master toilet. Goodbye black tiles!
|
View of bedroom 3 |
side track a little, which has nothing to do with reno, here's a link to some photos of Jules while he was at the Toa Payoh flat playing and running around in the wide open space!