1) new railings
2) new roof
3) new grilles
4) full floor and wall hacking
5) fully tiled floor and wall for all areas
6) false ceiling, light holders, partition walls
7) full re-wiring of the entire 2 floors, ceiling fans
8) additional helper's room
9) full carpentry works
10) painting works
11) full parquet for all the bedrooms upstairs
everything is new except for the windows!!
and today, the granite is here for installation. next we can install our basins and taps together with our shower mixers.
our dear home owners should be able to move in within the week.
here are the near completed photos to share.
the beautiful slim black railings. Personally i think the whole flat has a black and white colonial house look!
Granite countertop installed on the kitchen counter.
Goes really well with the black framed windows. Kitchen sink is left at the balcony area, will be installed once the granite countertop guys leave today. Even the sink is black! hah!
LED light strips for the kitchen task lighting. cool huh!
LED is the latest trend now.
here's how the dimmer control switch looks like!
let's go upstairs...
common bath - top mirror box installed and the swing doors for the bottom cabinet is in too!
master bath - same thing! Leaving the granite countertop and sanitary fittings - basin, shower mixer and tap to be installed later.
wee!
finally we can see everything in place now.