After 2 weeks, here are the recap on the progress on site:
  1. electrical works for ceiling in the kitchen
  2. concrete plinth for kitchen carpentry completed with tiles
  3. kitchen floor tiles completed
  4. bathroom floor and wall tiles completed
  5. toilet bowls installed
  6. shower heads installed
  7. storage water heater installed
  8. upstairs long stripes of parquet for bedrooms and foyer installed